Project

Engineering and Environmental Design for Large Warehouse

PROJECT

Engineering and Environmental Design for Large Warehouse

LOCATION

Harford Country, Maryland

Background

ENTRUST Solutions Group provided engineering and environmental design resources to successfully obtain all approvals allowing construction of a 600,000+ square foot cross-dock warehouse distribution center.

Challenges

The client called on ENTRUST Solutions Group to provide environmental design to meet stormwater requirements while also maximizing the building size.

Solutions

ENTRUST Solutions Group’s efficient environmental design allowed the client to maximize the useable area while avoiding and minimizing environmental constraints. The design included creative site work that met stormwater quantity and quality management requirements for a significant amount of impervious surfaces, while maximizing the building size, loading docks and truck/trailer storage. The 600,000 square foot facility includes a cross-dock warehouse, truck/trailer parking, storage and docking, employee parking, and administrative access.  The project involved successful abandonment of a County Road/ROW, offsite reforestation involving Harford County Parks and Recreation and plan adjustments as potential tenants were negotiating lease options with our client. ENTRUST also coordinated the legal, architectural, county and state approvals.

ENTRUST Solutions Group’s efficient environmental design allowed the client to maximize the useable area while avoiding and minimizing environmental constraints.