ENTRUST Solutions Group provided the initial FEED study for a major crude oil pipeline client, followed by the detailed engineering design and construction support for the extension of a 350-mile pipeline system that included modifications and expansion of existing terminals, pump stations and meter stations, and the addition of grassroots terminals and pump stations.
The expansion project required both upgrading older, existing infrastructure and grassroots facilities to meet the new flow rate and design conditions. All of the work had to be completed without impacting current operations, while moving substantially higher volumes through an existing pipeline system under the limitations of the operating pressures.
The project included engineering design, construction support, and procurement for the following facilities: